|


Location construction
for Marjo. Marjo typically builds a
large location in a time period of
approximately 7 days, and a small
location in one day. Most locations
feature open pit systems, which are more
economical and efficient than most
closed pit systems in which haul-off
pits must be continuously emptied of
fluids during drilling operations. In
addition, the majority of Marjo's
locations are graveled prior to
drilling, keeping the location intact
and reducing surface damage. |